Billing hazard-site removal: the complete process from call-off to XRechnung
How a deployment becomes a paid item: report, call-off, Zettel, take-off, collective invoice – and the places where it …
Learn moreContract work
A Rahmenvertrag is won when it is signed. It is earned across hundreds of individual Abrufe, every one of which has to be evidenced.
Call-off and evidence
Between the authority’s call and a checked invoice lie several handovers. Each one is a place where a document goes missing or a quantity is copied wrong.
A call, a note, a Zettel.
| Item | Description | Quantity |
|---|---|---|
| 01.01.0020 | Break up asphalt, up to 12 cm | 18.40 m² |
| 01.03.0060 | Supply and lay frost protection layer | 9.20 m³ |
| 01.08.0020 | Site safety measures, standard plan | 1.00 each |
Call-off 2026-0412 · framework contract
At an audit this is exactly the link that gets asked about: which item belongs to which call-off, and which call-off to which contract.
The flow
1Record the Abruf

Date, location, work – and which contract it belongs to.
2Zettel on site

The crew measures and writes as before; the paper does not change.
3Collect at month end

Abrufe under the same contract come together in one billing run.
4Issue one invoice

A hundred small jobs, one XRechnung the authority can check.
In contract work
Common questions
Bring a running Rahmenvertrag and a few Zettel from last month. You will see how a hundred small jobs become one invoice that survives checking.