Coming soon

Levora · Features

Features for document-based workflows

Levora connects capture, review and further processing in one structured product logic.

Feature 01

BoQ upload and data review

Bills of quantities can be imported via file upload or suitable formats such as GAEB. Relevant content like position number, short text, quantity, unit and prices is displayed in a structured way and can be reviewed or adjusted.
levora
Levora – BoQ upload with GAEB import and status overview

Feature 02

Editing approval with control logic

So that captured content can be corrected when needed, individual fields can be selectively released for editing. You keep the overview without giving up flexibility for OCR-related deviations.
levora
Levora – BoQ positions with locked and released fields

Feature 03

BoQ-based invoicing

Follow-up processes such as invoicing connect directly to existing BoQ data. Values stay consistent and no longer need to be transferred manually multiple times.
levora
Levora – creating an invoice directly from BoQ positions

Feature 04

Managing invoices per BoQ

Several invoices can be created, opened, edited and extended with attachments for each BoQ. The structure stays traceable and organised by project.
levora
Levora – central invoice overview with status and totals

Feature 05

Document logic with AI and OCR

Levora uses AI- and OCR-powered processing to recognise content from documents in a structured way and prepare it for the next steps. Uncertain content can be routed into the review process.
levora
Levora – OCR review with document preview and verification workflow

Want to see every feature live?

In a personal demo we walk you through Levora step by step – gladly with your own documents.

XRechnung and ZUGFeRD

XRechnung and ZUGFeRD from the checked items – with the Leitweg-ID, to EN 16931, verified against the KoSIT validator and veraPDF.

Learn more

Aufmaß under REB 23.003

Quantity determination under REB 23.003 with a visible calculation path, station measurement and exchange via DA11 and X31.

Learn more

Employees and fleet

Manage employees, machines and vehicles, and attach their working time to the site where the work actually happened.

Learn more

Framework contract call-offs (Abrufe)

Every Abruf attached to the right contract, every quantity to its item. Remaining volume visible, billed monthly in one run.

Learn more

GAEB and BoQ import

Read GAEB files from phases X81 and X83, check the items, price them and return the bid as X84.

Learn more

Traffic sign plan under RSA 21

Select RSA 21 standard plans, adapt them to the site and assemble the document for the verkehrsrechtliche Anordnung.

Learn more

Zettel recognition (OCR)

Photograph Aufmaß and time sheets instead of retyping them. Levora reads the handwriting and presents every quantity for approval – nothing is guessed.

Learn more