Levora does not read a Zettel with a single method. A calibrated image comparison first recognises the geometry of the form – where the zones are, which boxes are ticked, which lines are struck through. Only then does a second method read the actual handwriting in the fields.
That separation is why a struck-through item is still recognised as cancelled even when the figure underneath stayed perfectly legible. A single method misses that.
