GAEB import in Levora
The tender’s bill of quantities becomes an item list you can actually work on.
To the featureFree tool
Look at the bill of quantities, read the items as a table, take them away as CSV. The file is read in your browser and does not leave your machine.
Open a file
GAEB DA XML from any exchange phase – the file stays where it is.
The file stays on your machine. It is read in the browser – there is no upload, no server and no caching.
or drag it here – .x81, .x83, .x84, .x86, .x31
| OZ | Short text | Quantity | Unit |
|---|
The long text of an item is in the row's tooltip and in the CSV column “Langtext”.
Without JavaScript this tool can read nothing – JavaScript is precisely what evaluates the file on your machine instead of sending it away.
No upload, no server, no storage. You can open your browser's network panel and watch.
A bill of quantities is not a file like any other. It holds items, quantities and often the basis of a quotation’s costing – for a competitor it is the most interesting file your firm owns. The usual free GAEB viewers upload it to a server, show it to you there, and promise to delete it afterwards.
This tool has no server. The browser reads the file from your disk, evaluates it in memory and displays the result. If you do not want to believe that – and you should believe nobody who merely asserts it – open your browser’s network panel and load the file again. Not one request goes out.
| Exchange phase | Content | supported |
|---|---|---|
| X81 | Bill of quantities for submitting a bid | yes |
| X83 | Invitation to tender | yes |
| X84 | Bidder’s quotation | yes |
| X86 | Award of contract | yes |
| X31 | Quantity determination / take-off | yes |
| D81, D83 (text format) | old GAEB 90 | no |
Tested against the BVBS test file 3.3, a 3.2 file and two real tenders in the older 2004/07 namespace. What is displayed: item number (OZ), short text, quantity and unit; the long text sits in the row’s tooltip and in the CSV.
Prices are not displayed. An X81 does not contain any, and in an X84 they belong to nobody but the bidder – the viewer does not even read them out.
Two cases occur in practice. First: a file in the old GAEB 90 text format (D81, D83). In an editor it looks like a sequence of number blocks and is not XML – this tool does not read it. Second: a message or amendment file which is valid but contains no items at all. Then the tool says exactly that instead of showing an empty table.
Looking is the easy part. The work comes afterwards: pricing the items, setting the quantities from the take-off against them, and finally issuing an invoice that matches the tender. That is precisely what Levora is built for – the viewer here is a slice of it, free and without conditions.
Next
The tender’s bill of quantities becomes an item list you can actually work on.
To the featureThe take-off formulas – with the calculation visible.
To the toolThe check digits, before the invoice comes back.
To the toolBring a GAEB file. See the route from import to finished invoice on your own data.